Question: Instructions: Using the information below, reduce the project duration as much as possible. Follow the format: showing time, updated project network, and new total cost.
Instructions: Using the information below, reduce the project duration as much as possible. Follow the format: showing time, updated project network, and new total cost. Place explanation to support your answer.

SI 5 D 9 9 F 12 wow wut B 5 1 2 5 0 1 4 0 2 93 IWNT 3 5 9 12 13 0 A3 02 0 3 3 12 G 0 1 12 1 13 . 3 C7 2 2 5 4 9 7 3 10 E 9 1 2 12 Maximum Crash Time Activity A Crash Cost (Slope) 50 Normal Cost 40 1 B 20 1 Normal Time 3 2 4 4 30 2 D 20 30 2 20 40 40 E 0 0 2 F 40 2 3 1 20 30 G 0 0