Question: is responsible for determining the capacity required and with methods of making the capacity available ( 1 0 pts ) . a . Production planning

is responsible for determining the capacity required and with methods of making the capacity available (10pts).
a. Production planning
b. Master production scheduling
c. Production activity control|
d. Capacity planning
e. Material requirements planning
Rated capacity is calculated taking into account work center and (10pts).
historical data
II. utilization
III. efficiency
a. I and II
b. I and III
c. II and III
d. none of the above
 is responsible for determining the capacity required and with methods of