Question: Is the average time to complete an obstacle course longer when a patch is placed over the right eye than when a patch is placed

Is the average time to complete an obstacle course longer when a patch is placed over the right eye than when a patch is placed over the left eye? Nine randomly selected volunteers first completed an obstacle course with a patch over one eye and then completed an equally difficult obstacle course with a patch over the other eye. The completion times are shown below. "Left" means the patch was placed over the left eye and "Right" means the patch was placed over the right eye. metoCo -let.e the Course III-IIIIIIDDDD awmmmmmwemmm Copy to Clipboard Assume a Normal distribution. What can be concluded at the o: = 0.05 level of significance? For this study, we shodd use Select an answer v a. 'he null and alternative hypotheses would be: HI]: Select an answer v Select an answer v Select an answer v {please enter a decimal} H1: Select an answer v Select an answer v Select an answer v {Please enter a decimal} b. "he test statistic = :l {please show your answer to 3 decimal places] . "he p-value = :l {Please show your answer to 4 decimal places.) . "he p-value is o: . Based on this, we should the null hypothesis. Thus, the final conclusion is that Select an answer IthQO
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
