Question: It is planned to construct a building on a silty sand deposit. Assume the site conditions: Silty sand deposit has a level ground surface, a

It is planned to construct a building on a silty sand deposit. Assume the site conditions: Silty sand deposit has a level ground surface, a total unit weight \gamma t above the groundwater table of 18.9 kN/m3, and a submerged unit weight \gamma b of 9.84 kN/m3. The groundwater table is located 1.5m below ground surface. Standard penetration tests were performed in a 10-cm-diameter borehole. At a depth of 3 m below ground surface, a standard penetration test was performed using a doughnut hammer with a blow count of 3 blows for the first 15 cm,4 blows for the second 15 cm, and 5 blows for the third 15 cm of diving penetration. Calculate the factor of safety against liquefaction for the soil located at a depth of 3m below ground surface.
a. assume that sand contains 15% nonplastic fines, amax/g =0.1 and the earthquake magnitude M =7.5.
b. assume that sand contains no fines, amax/g =0.2 and the earthquake magnitude M=7.5.
c. assume that sand contains no fines, amax/g =0.4, the earthquake magnitude M =7.5 and qc=3.9 Mpa
d. assume that sand contains no fines, amax/g =0.4, the earthquake magnitude M =7.5 and shear wave velocity Vs=150m/s.
e. Assume that the liquefied soil layer is 1.0 m thick. For question b estimate the soil settlement, using two methods: Method by Ishihara and Yoshimine & method by Tokimatsu and Seed.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!