Question: It is proposed to construct a 1 m diameter tunnel beneath a road next to which sits a four storey Victorian brick building which is

It is proposed to construct a 1m diameter tunnel beneath a road next to which sits a four storey Victorian brick building which is built on 1m wide shallow foundations 1m deep. The load on the foundations is 200kN/m which are 30m long parallel to the road. The axis of the tunnel is 2m below the ground surface and 2m from the edge of the foundations. Calculate the maximum pressure acting on the crown of the tunnel. During tunnel construction, diagonal cracks were noticed in the Victorian building. The owners of the buildings were concerned so all work on the tunnel stopped. Explain why the building could have cracked and put forward a proposal to prevent further movement of the building yet still the tunnel to be completed using the information in Table B17-1. Calculations are not necessary.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!