Question: It is proposed to construct a new bridge across a river near Pondicherry. The soil deposit of the river bed is fully saturated with saturated

It is proposed to construct a new bridge across a river near Pondicherry. The soil
deposit of the river bed is fully saturated with saturated unit weight of 19.5
kNm2.The nearby fault system in Bay of Bengal could generate a peak horizontal
acceleration, amax of 0.15g at the site. Caissons are used as the bridge foundation.
The bottom of the caissons is at a depth of 5m below the riverbed.
The CPT tests were carried out at the above site. At the depth of 5m below the
ground, the penetration resistance at the cone tip and the sleeve were measured to be
5MPa and 100kPa respectively.
During the design earthquake of magnitude 6.0, will the saturated soil located at the
bottom of the caisson be liquefied?
It is proposed to construct a new bridge across a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!