Question: ITE 305 Systems Analysis and Design Assignment 2 System Size and Time Effort Imagine that job hunting has been going so well that you need

 ITE 305 Systems Analysis and Design Assignment 2 System Size and

ITE 305 Systems Analysis and Design Assignment 2 System Size and Time Effort Imagine that job hunting has been going so well that you need to develop a system to support your efforts. The system should allow you to input information about the companies with which you interview, the interviews and office visits that you have scheduled, and the offers that you receive. It should be able to produce reports, such as a company contact list, an interview schedule, and an office visit schedule, as well as generate thank-you letters to be brought into a word processor to customize. You also need the system to answer queries, such as the number of interviews by city and your average offer amount. QUESTIONS: 1. Determine the number of inputs, outputs, interfaces, files, and queries that this system requires. For each element, determine whether the complexity is low, medium, or high. Record this information on a worksheet similar to the one that was given to you (slide 12). 2. Calculate the total function points for each line on your worksheet by multiplying the number of each element with the appropriate complexity score. 3. Sum up the total unadjusted function points. 4. Suppose that the system will be built by you using Visual Basic (VB). Given your VB skills, multiply the TUFP score by the APC score that best estimates how complex the system will be for you to develop (.65 = simple, 1 = average, 1.35 = complex), and calculate a TAFP value. 5. Using the table given to you (slide 18), determine the number of lines of code that correspond to VB. Multiply this number by the TAFP to find the total lines of code that your system will require 1. Refer to the project size and lines of code that you calculated above QUESTIONS: 1. Determine the effort of your project in person-months of effort by multiplying your lines of code (in thousands) by 1.4. 2. Calculate the schedule time in months for your project by using the formula 3.0 _ person-months 1/3. 3. Based on your numbers, how much time will it take to complete the project if you are the developer

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!