A bike assembly line in a manufacturing system uses 400 pedals per day. Pedals can be produced at a rate of 800 units per day. The shop operates 20 days a month. Assume that demand is uniform throughout the month. Setup cost is $90 for a run, and holding cost is $1 per year. What will be the production run length for the optimal production run quantity)?
Multiple Choice
6.47 days
5.36 days
11.25 days
7.35 days
3.675 days