Question: ITS 330 - Advanced Operating System (15 points) Consider the following set of jobs. Job Number Arrival Time CPU burst Time 2 Clearly show the
ITS 330 - Advanced Operating System (15 points) Consider the following set of jobs. Job Number Arrival Time CPU burst Time 2 Clearly show the scheduling of these jobs by the Gantt chart (12 points) using Multilevel feedback And then compute average waiting time (3 points). Please note: Number of queue levels-4, time quantum = 1 for all levels. when a time quantum expi running job will go down and be put at the end of the lower level queue. If the running job is already lowest level queue, it will be simply put at the end of the queue. All jobs in the same level queue will selected using RR scheduling algorithm