Question: It's a multiple choice question Please solve all the questions Choose the correct answers for the following 10 questions Q1 Productivity: a) can use many


It's a multiple choice question Please solve all the questions
Choose the correct answers for the following 10 questions Q1 Productivity: a) can use many factors as the numerator. b) is the same thing as production. c) increases at about 0.5% per year. d) is dependent upon labor, management, and capital e) is the same thing as effectiveness. Q2 Single-factor productivity: a) remains constant b) is never constant. c) usually uses labor as a factor d) seldom uses labor as a factor. e) uses management as a factor. Q3 Productivity increases each year in the U.S. are a result of three factors: a) engineering, labor, capital b) engineering, capital, quality control c) engineering, labor, data processing d) labor, capital, management e) engineering, capital, data process Q4 Evaluating outsourcing providers by comparing their weighted average scores involves: a) cost-volume analysis. b transportation model analysis. c) linear regression analysis. d) factor-rating analysis. e) crossover analysis Q6 Which of the following statements regarding Gantt charts is true? a) Gantt charts give a timeline and precedence relationships for each activity of a project. b) Gantt charts use the four standard spines: Methods, Materials, Manpower, and Machinery. c) Gantt charts are visual devices that show the duration of activities in a project. d) Gantt charts are expensive. e) All of the above are true Q7 A house of quality is: a) a schematic showing how a product is put together. b) a list of the operations necessary to produce a component. c) an instruction to make a given quantity of a particular item. d) a set of detailed instructions about how to perform a task. e) a matrix relating customer wants to the firm's "hows." Q8 A route sheet: a) is an instruction to make a given quantity of a particular item. b) is a schematic showing how a product is assembled. c) is a document showing the flow of product components. d) lists the operations necessary to produce a component. e) all of the above. Q9 The difference between a gross material requirements plan (gross MRP) and a net material requirements plan (net MRP) is: a) the gross MRP may not be computerized, but the net MRP must be computerized. b) the gross MRP includes consideration of the inventory on hand, whereas the net MRP doesn't include the inventory consideration. c) the gross MRP doesn't take taxes into account, whereas the net MRP includes the tax considerations. d) the net MRP is only an estimate, whereas the gross MRP is used for actual production scheduling e) the net MRP includes consideration of the inventory on hand, whereas the gross MRP doesn't include the inventory consideration Q10 Which of the following is not a characteristic of the factor- weighting approach to supplier evaluation? a) It applies quantitative scores to qualitative criteria b) the weights typically sum to 100% c) multiple criteria can be considered simultaneously d) subjective judgment is often involvedStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
