Question: ( iv ) The figure below shows an incorrect logic diagram. It has unnecessary restrains and gaps in the logic. Retra and renumber the figure

(iv) The figure below shows an incorrect logic diagram. It has unnecessary restrains and gaps
in the logic. Retra and renumber the figure so as to correct the errors.
(v) For the following network, make a table:
(vi) Why is the following network diagram redundant? Draw the correct one.
(vii) Consider a project involving the installation of a new machine and training the operator.
Assume that the training of the operator can begin as soon as he is hired and the machine is
installed. The training is to start immediately after installation and is not to be delayed for
inspection of the machine. The inspection is to be made after the installation is complete. Is the
following network correct? If not! Draw the correct one.
(viii) Consider the following statements:
Activity A Precedes Activity B
Activity A Precedes Activity C
Activity B Precedes Activity D
Activity C Precedes Activity E
Activity E Precedes Activity F
Activity D and Activity F precede Activity G
Draw a logical network.
( iv ) The figure below shows an incorrect logic

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!