Question: Joe studied his control chart and noticed it had been built with repeated samples of ten units and three-sigma limits that were UCL = 109.0125
Joe studied his control chart and noticed it had been built with repeated samples of ten units and three-sigma limits that were UCL = 109.0125 and LCL = 90.9875. What is the process standard deviation?
A)9.5
B)6.7
C)5.2
D)3
Step by Step Solution
3.44 Rating (157 Votes )
There are 3 Steps involved in it
Correct option is A 95 Cotect optron is A 95 Explanation Gi... View full answer
Get step-by-step solutions from verified subject matter experts
