Question: Joe studied his control chart and noticed it had been built with repeated samples of ten units and three-sigma limits that were UCL = 109.0125

Joe studied his control chart and noticed it had been built with repeated samples of ten units and three-sigma limits that were UCL = 109.0125 and LCL = 90.9875. What is the process standard deviation?

A)9.5

B)6.7

C)5.2

D)3


Step by Step Solution

3.44 Rating (157 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Correct option is A 95 Cotect optron is A 95 Explanation Gi... View full answer