Question: joints are slightly rough / weathered and continuous, with separation distance between the joint surfaces ranging between 1 . 0 - 1 . 3 m

joints are slightly rough/weathered and continuous, with separation distance
between the joint surfaces ranging between 1.0-1.3mm.
Joint #2 strikes 45 to long axis of planned excavation, dips 20 and repeats at
intervals of approximately 0.3m; surface of these joints are very rough and
discontinuous with separation between surfaces being 0.1mm.
Stress / Water Conditions:
Maximum ground stress components are expected to be horizontally directed, of
magnitude less than 1.5 times vertical stress component, and uniformly distributed
horizontally at the site of excavation; minimal water flow (5Lmin at low
pressure) from the rock is anticipated.An underground tunnel is planned to be excavated in rock. This excavation is to be
developed initially on the basis of diamond drill core data retrieved by remote drilling, as
no site development currently has taken place. Based upon information which is
provided:
a. Determine the RQD for the core shown;
b. Determine the RMR for the rock mass at the proposed development site;
c. Determine the limiting excavation dimensions (maximum and minimum);
d. Determine the unsupported stand-up times for these excavation dimensions and
the range of rock reinforcement that would be necessary for the excavation (over
the dimension ranges selected).
Given:
Core Recovery Data: As illustrated in Figure of core box sketch
(total length of core recovered =3.0m).
Core Strength Data:
Joint Conditions:
Two joint families identified:
See info on screenshots
joints are slightly rough / weathered and

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!