Factory Overhead Controllable Variance
Bellingham Company produced units of product that required standard direct labor hours per unit. The standard variable overhead cost per unit is $ per direct labor hour. The actual variable factory overhead was $ Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Factory Overhead Controllable Variance
Bellingham Company produced units of product that required standard direct labor hours per unit. The standard variable overhead cost per unit is $ per direct labor hour. The actual variable factory overhead was $ Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
$
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock