Question: Kindly answer all 6 questions please. ( shown in the photo attached ) They are all connected. Thank you very much. average angle of swing
Kindly answer all questions please. shown in the photo attached They are all connected. Thank you very much.
average angle of swing is
Using information from the previous question, what would be the dimensions of a
triangular spoil bank if the trench is yards long and the cross section of the
trench is as seen below?
A hydraulic shovel with a yd front dump bucket will load the sand and
gravel from the previous question into haul units for removal. The average angle
of swing is and job efficiency is the same as in question What is the
expected production in LCYhour
Calculate the number of haul units theoretically required in the previous question
if the unit haul capacity is and truck cycle time excluding loading is
minutes.
What is the total cost of the project based on the hourly charge for operator &
equipment based on the volumes calculated and the production of each piece of
equipment?
a Excavator and operator $ per hour
b Loader and operator $ per hour
c Each Haul unit $ per hour
What is the unit cost per LCY
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock