Question: Kleinberg, Jon. Algorithm Design ( p . 1 9 1 , q . 7 ) Now let each job consist of two durations. Ajob i

Kleinberg, Jon. Algorithm Design (p.191, q.7) Now let each job consist of two durations. Ajob i must be preprocessed for pi time on a supercomputer, and then finished for fi time on astandard PC. There are enough PCs available to run all jobs at the same time, but there is only onesupercomputer (which can only run a single job at a time). The completion time of a schedule isdefined as the earliest time when all jobs are done running on both the supercomputer and the PCs.Give a polynomial time algorithm that finds a schedule with the earliest completion time possible.