Question: Know and Understand Answer the following questions using the information in this chapter. True or False? Grading may be needed before building lines are laid

Know and Understand
Answer the following questions using the information
in this chapter.
True or False? Grading may be needed before
building lines are laid out.
It is best to locate building lines with a builder's
level, transit, or
A. auto level
C. theodolite
B. laser level
D. total station
A residence may need as much as 8' to
of
clearance for batter boards.
A.10
C.3
B.4
D.15
True or False? Building sites on steep slopes or
rugged terrain should be rough-graded before the
building is laid out.
The highest point on the perimeter of an
excavation is known as the
A. grade level
C. grade point
B. control point
D. building line
IRC now allows frost-protected shallow
foundations that are only
" below grade.
A.6
C.16
B.12
D.36
A
footing is one that changes grade levels at
intervals to accommodate a sloping lot.
A. spread
C. reinforced
B. plain
D. stepped
In residential construction, a common practice is
to make the width of the footing
the foundation wall.
as wide as
A. half
B. twice
C. one and a half times
D. equally
True or False? Concrete for chimney and wall
footings must be placed at different times.
The spacing of walers depends on the amount of
the concrete exerts on the form.
A. temperature
B. friction
C. pressure
D. moisture
Which of the following materials is generally not
used for small wall openings?
A. Plastic.
B. Fiber.
C. Concrete.
D. Metal.
Concrete is made by mixing
sand, gravel,
and water in proper proportions.
A. cement
B. grout
C. mud
D. mortar
Know and Understand Answer the following

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!