Question: l Custs for the Ppn8 Department. > Problems Group A P20-32A Preparing a production cost report, no beginning WIP or costs Le transferred in Dee

 l Custs for the Ppn8 Department. > Problems Group A P20-32A

l Custs for the Ppn8 Department. > Problems Group A P20-32A Preparing a production cost report, no beginning WIP or costs Le transferred in Dee Electronics makes game consoles in three processes: assembly, programming, and packaging. Direct materials are added at the beginning of the assembly pro- cess. Conversion costs are incurred evenly throughout the process. The Assembly Department had no Work-in-Process Inventory on October 31. In mid-November, Dee Electronics started production on 100,000 game consoles. Of this number, 90,000 game consoles were assembled during November and transferred out to the Programming Department. The November 30 Work-in-Process Inventory in the Assembly Department was 35% of the way through the assembly process. Direct materials costing $399,000 were placed in production in Assembly during November, direct labor of $139,000 was assigned, and manufacturing overhead of $130,280 was allocated to that department. Requirements 1. Prepare a production cost report for the Assembly Department for November. The company uses the weighted-average method. 2. Prepare a T-account for Work-in-Process Inventory-Assembly to show its activ- ity during November, including the November 30 balance. l Custs for the Ppn8 Department. > Problems Group A P20-32A Preparing a production cost report, no beginning WIP or costs Le transferred in Dee Electronics makes game consoles in three processes: assembly, programming, and packaging. Direct materials are added at the beginning of the assembly pro- cess. Conversion costs are incurred evenly throughout the process. The Assembly Department had no Work-in-Process Inventory on October 31. In mid-November, Dee Electronics started production on 100,000 game consoles. Of this number, 90,000 game consoles were assembled during November and transferred out to the Programming Department. The November 30 Work-in-Process Inventory in the Assembly Department was 35% of the way through the assembly process. Direct materials costing $399,000 were placed in production in Assembly during November, direct labor of $139,000 was assigned, and manufacturing overhead of $130,280 was allocated to that department. Requirements 1. Prepare a production cost report for the Assembly Department for November. The company uses the weighted-average method. 2. Prepare a T-account for Work-in-Process Inventory-Assembly to show its activ- ity during November, including the November 30 balance

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!