Lagging Design: A soldier pile and lagging system uses an HP 1489 soldier pile and 1ft1ft steel
Fantastic news! We've Found the answer you've been seeking!
Question:
Lagging Design:
A soldier pile and lagging system uses an HP
14×89
soldier pile and 1ft×1ft
steel plate that is 0.75 in thick. The spacing between piles is 6.5ft.
The maximum design pressure for lagging is 450lb/ft^2
What is the maximum bending stress ?
Related Book For
Posted Date: