Question: Large systems are typically acquired in defined phases separated by milestone events. Collectively, the phases and milestone events are referred to as: A . the
Large systems are typically acquired in defined phases separated by milestone events. Collectively, the phases and milestone events are referred to as:
A
the product design engineering path
B
the design evolution and test stages DETS
C
the sequence of activities path SAP
D
the systems acquisition process SAP which is also referred to as the Life Cycle Acquisition Process