Question: Lean Manufacturing and Lean Analysis Practice Quiz 1. ABC Co. manufactures desks in the finishing and assembly process. Desks are manufactured in 20 unit batches.

Lean Manufacturing and Lean Analysis Practice Quiz 1. ABC Co. manufactures desks in the finishing and assembly process. Desks are manufactured in 20 unit batches. The finishing time is 12 minutes and the assembly time is 8 minutes per desk. It takes 20 minutes to move a batch of desks from finishing to assembly. (a) Compute the value added, non-value added, and total lead time of this process. (b) Compute the value-added ratio (round to one decimal place if necessary). (c) A study was conducted resulting in the following changes: Desks made in 30 unit batches Finishing time reduced to 8 minutes Move time reduced to 16 minutes Compute the total lead time and value added ratio after the process changes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!