Question: Levelized cost: A nuclear power reactor is being built in Georgia. The cost is higher than initially projected. The capital cost for the two reactor

Levelized cost: A nuclear power reactor is being built in Georgia. The cost is higher than initially projected. The capital cost for the two reactor is now $30 billion. Assume that the operating cost is $0.01/kWh. Each reactor has a capacity of 1100MW (so the total project has a capacity of 2200MW ), and is expected to have a capacity factor of 90% (that is, it will run on average at 90% of its capacity). Assume a lifetime of 30 years and a discount rate of 7%. What will be the levelized cost of electricity, in $/kWh
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock