Question: life cycle cost analysis: existing pavement design: 9 jointed plain slab, 4 Cement slab, 4 cement - treated base, silty clay subgrade,
life cycle cost analysis: existing pavement design: jointed plain slab, Cement slab, cementtreated base, silty clay subgrade, rural, lane divided highway, contraction joints are spaced at on center, dowels space at on center provide the load the the load transfer, the pavement is years old. existing pavement condition: of the slabs in the outer lane experience medium to high severity transverse crack, random spalling along joints and cracks is present, of the joints exhibit low to medium severity faulting, the average PSI is the asphalt shoulder is in fair condition. Fearsible repair alternative: work item: replace cracked slabs FDRyes, Partial depth repairs of spallsyes, stabilize slabsyes, subdrains yes, grind faultsyes, AC overlayyes, replace outer laneyes, PCC tied shouldyes, initial service life years alternative alternative alternative assume an analysis period of years for an equal performance period. Assumea discount rate of
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
