Job-Sequencing Model Example 9.1-4 Jobco uses a single machine to process three jobs. (Both the processing time and the due date (in days) for each job are given in the following tables. The due dates are measured from zero, the assumed start time of the first job. proceesing Due date Late time (pj) (dj) penality (0) job (j) 1 5 25 19 2 20 22 12 3 15 35 34 The objective of the problem is to determine the minimum late penalty sequence for processing the three jobsStep by Step Solution