Question: Linear Programming Problem A firm manufactures two products A and B, which passes through manual and machine processes. The time required by each unit and
Linear Programming Problem
A firm manufactures two products A and B, which passes through manual and machine processes. The time required by each unit and the total available time is as given below here:
| Per unit requirement(hours) Total hours available |
| A B |
| Labour 4 2 1,600 Machine 6 5 3,000 |
The enthusiastic production manager requires that at least 300 units of A and 300 units of B should be produced. It is known that one unit of A yields Rs 10 of profit, while a unit of B yields Rs 8. In your opinion, what should be optimum production mix so that all the constraints are satisfied?