Question:
Linear Programming Q: A plant manager is attempting to determine the production schedule of various products to maximize profit. Assume that a machine hour constraint is binding. If the original amount of machine hours available is 200 minutes, and the range of feasibility is from 130 minutes to 300 minutes, providing two additional machine hours will result in Group of answer choices
- the same product mix, different total profit.
- a different product mix, different total profit.
- the same product mix, same total profit.
- a different product mix, same total profit as before.