Question: - llange 0 0 : 0 1 CCB 5 4 2 Assignment 2 ( 1 ) . pdf QUESTION A contract for an office building
llange
:
CCB Assignment pdf
QUESTION
A contract for an office building includes the provision of a storage tank. Drawing No QI shows the plan and section of the proposed storage tank. Take off quantities for the following work.
a Topsoil excavation.
Marks
b Basement excavation.
Marks
c Filling to basement excavation and replacement of topsoil around the structure.
Marks
Specifications
Topsoil to be excavated over the area of the structure for a width of all round same and deposited away for reuse.
Topsoil to be excavated to a depth of
Excavate for basement including filling around the structure and remove surplus soil from site.
Filling is to be of selected excavated material.
Filling around the structure with topsoil depth.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock