Question: LS and LF, activity H-A using backward pass OOO 5.5 www A Consult with engineering Activity Duration (weeks) Predecessors ES EF 4 None B Determine

LS and LF, activity H-A using backward pass LS and LF, activity H-A using backward pass OOO
OOO 5.5 www A Consult with engineering Activity Duration (weeks) Predecessors ES EF 4 None B Determine equipment layout 6 4 None None Install equipment 6 AB B 6 None 6 D Order materials 25 A E Test equipment 6 55 AB 6 12 F Train employees 0.5 DE D 25 A 4 6.5 G Perform pilot runs 1.5 F H Get OSHA approval 35 12 17.5 E F 0.5 DE 18.0 Print G 1.5 F Done 18 19.5 H 35 E 175 21 Calculate the late start and inte finish times for the euch activity performing the backward pass. Ful in the table below (entor your responses rounded to one decimal place) Activity Duration (weeks) Predecessors LS LF H 3.5 E 173

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!