Question: Machine 1 : can't run at the same time as Machine 4 . Machine 2 : can run at the same time as Machine 4

Machine 1: can't run at the same time as Machine 4.
Machine 2: can run at the same time as Machine 4.
Machine 3: can't run at the same time as Machine 4.
\table[[,,,,,,,,,,,,],[9,10,11,12,1,2,3,4,5,6,,,]]
Question
The coloured blocks represent times when the machines are scheduled to run. A 60-minute gap is needed after running Machine 3 before starting Machine 4. Schedule a ontshour time for Machine 4.
Machine 4
 Machine 1: can't run at the same time as Machine 4.