Question: Maintain accoutning information system PR 2 Case study P & 5 Furniture Mart, after operating Its Inventory control system for a while, discovers that it




Maintain accoutning information system
PR 2 Case study P & 5 Furniture Mart, after operating Its Inventory control system for a while, discovers that it may have to modify the existing system. The existing system was based on a master plan that was designed to fudlitate the incorporation of other systems at a later stage. The technology which the master plan wm based on has become so advanced that the introduction of additional systems may be impossible without modifications to the existing Inventory control system. In fact, it may be necessary to replace the whole wystem David and Mary agree that modifying or replacing the existing system because of the computer equipment involved requires a substantial commitment of time and resources. They also realise that when they undertake to change the existing system a series of steps will need to be undertaken including: surveying the existing system analysing the Information collected during this survey with a view to recommending certain actions designing a modified or new system - researching and acquiring the appropriate equipment Implementing the modified or new systern. David and Mary agree that these are not separate steps but may overlap each other and that these steps may need to be retraced sometimes in order for the whole project to be successful. One of P & 5 Furniture Mart's esteemed customers overhears the discussions between you (the accountant for P& S Furniture Mart) and David on this matter. The customer meets you that evening at the pub and wonders why David and Mary have to undertake such a difficult task. Please answer the following questions related to this Case Study PR 2.1 How will you explain the reasons for the survey of the existing inventory control wystem? Also describe what would be your role as a project team member who perform the review and analysis steps? MRO FERD PR 2.3 What would be your role as a project team member who performs the survey and analysis steps? W Aa An BhCK AaBbCel An BbCel ABCD Aance AoBbcel Abbcod 1. ABC Albcd AaBbcc Aabbe ompliant Compliant. Compliant... Compliant. Compliant For Creati Guidance I Nom 1 Nume No Leading compliant Headings The Project tasks are hypothetical situations which will not require you to have access to a workplace, although your past and present workplace experiences may help with the responses you provide. You will be expected to encounter similar situations to these in the future as you work in the business sector. in real life, accountants will be required to review corporate governance requirements, implement, and monitor internal control operating procedures, This assessment will help you demonstrate skill requirements in such situations (Relates to the physical design stage of the System Development Life Cycle for the new Payroll system for Sanderson Sausages. You will be asked to list and describe issues that would be considered in the selection of the relevant hardware that is being considered for the system.) During the physical design stage of the System Development Life Cycle for the new Payroll System for Sanderson Sausages, were a number of system considerations that had to be reviewed including: Application software Hardware selection criteria Software selection criteria One of the Hardware considerations was whether to use simple Time Cards, Smart Cards or a Sign on Register. The software considerations reviewed custom or available commercial software and the advantages of each. PR 1.1 What is meant by the Physical Design stage of the System Development Life Cycle? Briefly describe what this stage means and the system activity that is included in it. The new system must be designed once any user put forwards the requirements and the detailed analysis of the new system. This part of the process is the system design. The logical design produced during the process of analysis is converted into a physical design. It is the detailed information of what is required to solve the original problem. The various system activities included in this process is data structure, interface, procedures regarding the operation of the system, documentation control process and workload. brody11AAAAA91 ABC ABC Aa Bbcel Aa Bbc Compliant Compilat compliant Comments grar PR 12 List and describe four (4) matters that would be considered in the selection of the relevant hardware to be considered for the system. PR 2 Case stud P & S Fur to modify facilitate based on modificatie system. MRD FERD David and Involved res undertakete analy action desiga resear Impler David and Mar may need to beStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
