Question: Maintenance at a major theme park in central Florida is an ongoing process that occurs 24 hours a day. Because it is a long drive
Maintenance at a major theme park in central Florida is an ongoing process that occurs 24 hours a day. Because it is a long drive from most residential areas to the park, employees do not like to work shifts of fewer than 8 hours. These eight hour shifts start every 4 hours throughout the day. The number of maintenance workers needed at different times throughout the day varies. The following table summarizes the minimum number of employees needed in each 4-hour time period.
Time PeriodMinimum Employees Needed
12 a.m. to 4 a.m.90
4 a.m. to 8 a.m.215
8 a.m. to 12 p.m.250
12 p.m. to 4 p.m.165
4 p.m. to 8 p.m.300
8 p.m. to 12 a.m.125
The maintenance supervisor wants to determine the minimum number of employees to schedule that meets the minimum staffing requirements.
a. LP model for this problem.
b. Spreadsheet model for this problem and solve it using Solver.
c. The optimal solution