eview View Tell me 21 ABCCODER Normal SOALAN 20 (NO.20) CH. 7 Ceous Ceed on table and figure belowe, complele Tubes of MP Ordering $250 Carving cost-$0.12 On LAN Twe Scheduled Rac Hand 150, Week 2 100 250 Week 2150 Wipek $ 220, W 1 200 Week 3 150 2 70 WH 2 100 120, Week 140 2 150 Week 450 G 2 120 Week 2 Pin Complete the MP ble bed on lot sizing LAL and calculate the co tem LICKO Parod Lot Size LT: 1 1 2 3 4 LAL (o for lot) Gross Requirements (What company giveaway Scheduled Receipts (what u gaddonal material) Projected on Hand 100 (what we have) Net Requirements (what we need) Planned Order Recep Planned Order Releases Cost M R P Document1 D 6 AaBbCcDdEe No Spacing AaBb Head Lot Size: 6 7 MIN110 Gross Requirements Scheduled Receipts 200 Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases Cost: ii) Complete the MRP table based on lot sizing: MULT150 and calculate the cost; Item: T LLC: 1 Period Lot Size: 9 LT: 2 1 2 3 4 5 6 7 8 MULT150 Gross Requirements Scheduled Receipts Projected on Hand 70 Net Requirements Planned Order Receipts Planned Order Releases Cost: iv) Complete the MRP table based on lot sizing: L4L and calculate the cost Item: R LLC: 2 Period 1 2 3 4 5 6 7 Lot Size: L4L LT: 2 Gross Requirements Scheduled Receipts Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases Cost: LT: 1 150 140 1 2 3 4 5 8 00 8 9 9 AaBbCcDdEe Normal Complete the MF table based on lot sizing MIN500 and calculate the cost Hem P UC: 2 Period Lot Se LT 2 1 2 3 4 5 6 7 8 MINS00 Gross Requirements Scheduled Receipts Projected on Hand 450 Net Requirements Planned Order Receipts Parned Order Releases Cost ) Complete the MP sable based on lot sizing, MULT350 and calculate the cont Hem G LLC 2 Period Lot Size LT: 2 1 2 3 4 5 6 7 8 MULT350 Gross Requirements Scheduled Receipts Projected on Hand 180 Net Requirements Planned Order Hecepts Planned Order Releases Cost on above MRP, summate the res in the Planned Order Report as flowe PLANNED ORDER REPORT ITEM Period 1 2 3 4 5 6 E M R P G TOTAL AaBbCcDdEe No Spacing Aal SOALAN 20 (NO.20) CH. 7 Cengkih Cafe. Based on table and figure below, complete the tables of MRP as follows: Ordering cost = $250; Carrying cost = $0.12 per unit Item Lead On Gross Requirements Scheduled Receipt Time Hand E 1 150; Week 2 100 250: Week 3; 150; Week 5 220; Week 8 M 1 200: Week 3 150 T 70; Week 2 100 R 120: Week 7 140 P 150; Week 4 450 G 120; Week 2 180 M(3) RC) P.:(2) P(3) G(2) i) Complete the MRP table based on lot sizing: L4L and calculate the cost; Item: E LLC: 0 Period Lot Size: LT: 1 1 2 3 4 5 7 L4L (lot for lot) Gross Requirements (What company giveaway) Scheduled Receipts (what u get)(additional material) Projected on Hand 100 (what we have) Net Requirements (what we need) Planned Order Receipts 20 IN 2 2 NN 2 TOD 6 8 9 Planned Order Receipts Planned Order Releases Cost: v) Complete the MRP table based on lot sizing: MIN500 and calculate the cost Item: P LLC: 2 Period Lot Size: LT: 2 12345 6 7 8 MIN500 Gross Requirements Scheduled Receipts Projected on Hand 450 Net Requirements Planned Order Receipts Planned Order Releases Cost: vi) Complete the MRP table based on lot sizing: MULT350 and calculate the cost Item: G LLC: 2 Period Lot Size: 9 LT: 2 1 2 3 4 5 6 7 8 MULT350 Gross Requirements Scheduled Receipts Projected on Hand 180 Net Requirements Planned Order Receipts Planned Order Releases Cost: on above MRP, summarize the results in the Planned Order Report as follows PLANNED ORDER REPORT ITEM Period 1 4 5 6 8 E M T R P G TOTAL IN 2 3 IN 7 9 Planned Order Receipts Planned Order Releases Cost: v) Complete the MRP table based on lot sizing: MIN500 and calculate the cost: Item: P LLC: 2 Period Lot Size: LT: 2 1 2 3 4 5 6 7 8 MIN500 Gross Requirements Scheduled Receipts Projected on Hand 450 Net Requirements Planned Order Receipts Planned Order Releases Cost: vi) Complete the MRP table based on lot sizing: MULT350 and calculate the cost; Item: G LLC: 2 Period Lot Size: 9 LT: 2 1 2 3 4 5 6 7 8 MULT350 Gross Requirements Scheduled Receipts Projected on Hand 180 Net Requirements Planned Order Receipts Planned Order Releases Cost: on above MRP. summarize the results in the Planned Order Report as follows PLANNED ORDER REPORT ITEM Period 1 2 4 5 6 8 9 E M T R P G TOTAL 3 7 9

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!