Question: Manual Assembly Lines A B D E F G J Work element or tasks Time (min) Preceding 0.5 0.3 0.8 0.2 0.7 1.0 1.1 A

Manual Assembly Lines A B D E F G J Work element

Manual Assembly Lines A B D E F G J Work element or tasks Time (min) Preceding 0.5 0.3 0.8 0.2 0.7 1.0 1.1 A 0.6 B,C 0.9 0.4 F G, H, 1 A A D E F Solve the previous problem but use the ranked positional weights method in part (c)