Question: Manufacturing Engineering (Lean Management) Value Stream Map A STEEL FABRICATION COMPANY HAS RELEASED INFORMATION ON THE PRODUCTION DEMAND AS FOLLOWS: PRODUCT DEMAND : 1000 PCS/WEEK

Manufacturing Engineering (Lean Management)

Value Stream Map

A STEEL FABRICATION COMPANY HAS RELEASED INFORMATION ON THE PRODUCTION DEMAND AS FOLLOWS:

  1. PRODUCT DEMAND : 1000 PCS/WEEK
  2. PRODUCTION PLANNING : PRODUCE MATERIAL REQUIREMENT TO SUPPLIER
  3. PRODUCTION DEPARTMENT/MANAGER: PREPARE THE MONTHLY PRODUCTION SCHEDULE
  4. SUPPLIER: CAPACITY TO DELIVER 250 SETS LOOSE PARTS PER WEEK
  5. PRODUCTION LINE:
STATION PROCESS INVENTORY CYCLE TIME(MIN)
1 WELDING & WASHING 250 15
2 PAINTING 20 10
3 ASSEMBLY LINE 10 20
4 UNDERCARRIAGE JOB 20 15
5 QUALITY INSPECTION 40 20
6 TRIM AND FINAL JOB 20 15
7 INSPECTION AND DELIVERY 30 30
  1. YOU ARE REQUIRED TO PREPARE THE ABOVE VSM FLOW DIAGRAM INDICATING CURRENT AND FUTURE STATE. SHOW THE TOTAL PROCESS LEAD TIME (PLT) AND PROCESS TIME(PT), BEFORE AND AFTER IMPROVEMENT. IMPROVEMENTS MUST FOCUS ON ELIMINATION OF NON VALUE ADDED ACTIVITIES WITH REDUCTION OF PLT AND PT. DISCUSS THE RESULT OF THE IMPLEMENTATION.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!