Question: Manufacturing Engineering (Lean Management) Value Stream Map A STEEL FABRICATION COMPANY HAS RELEASED INFORMATION ON THE PRODUCTION DEMAND AS FOLLOWS: PRODUCT DEMAND : 1000 PCS/WEEK
Manufacturing Engineering (Lean Management)
Value Stream Map
A STEEL FABRICATION COMPANY HAS RELEASED INFORMATION ON THE PRODUCTION DEMAND AS FOLLOWS:
- PRODUCT DEMAND : 1000 PCS/WEEK
- PRODUCTION PLANNING : PRODUCE MATERIAL REQUIREMENT TO SUPPLIER
- PRODUCTION DEPARTMENT/MANAGER: PREPARE THE MONTHLY PRODUCTION SCHEDULE
- SUPPLIER: CAPACITY TO DELIVER 250 SETS LOOSE PARTS PER WEEK
- PRODUCTION LINE:
| STATION | PROCESS | INVENTORY | CYCLE TIME(MIN) |
| 1 | WELDING & WASHING | 250 | 15 |
| 2 | PAINTING | 20 | 10 |
| 3 | ASSEMBLY LINE | 10 | 20 |
| 4 | UNDERCARRIAGE JOB | 20 | 15 |
| 5 | QUALITY INSPECTION | 40 | 20 |
| 6 | TRIM AND FINAL JOB | 20 | 15 |
| 7 | INSPECTION AND DELIVERY | 30 | 30 |
- YOU ARE REQUIRED TO PREPARE THE ABOVE VSM FLOW DIAGRAM INDICATING CURRENT AND FUTURE STATE. SHOW THE TOTAL PROCESS LEAD TIME (PLT) AND PROCESS TIME(PT), BEFORE AND AFTER IMPROVEMENT. IMPROVEMENTS MUST FOCUS ON ELIMINATION OF NON VALUE ADDED ACTIVITIES WITH REDUCTION OF PLT AND PT. DISCUSS THE RESULT OF THE IMPLEMENTATION.