Question: Match the Earned Value Cost / Schedule System acronym on the left with the appropriate description on the right. EV EV drop zone empty. PV
Match the Earned Value CostSchedule System acronym on the left with the appropriate description on the right.
EV
EV drop zone empty.
PV
PV drop zone empty.
AC
AC drop zone empty.
CV
CV drop zone empty.
BAC
BAC drop zone empty.
ETC
ETC drop zone empty.
VAC
VAC drop zone empty.
SV
SV drop zone empty.
EAC