Question: Match the hazard control strategy with the appropriate level from the Hierarchy of Controls: De-energization of a live circuit before installing a new light fixture
Match the hazard control strategy with the appropriate level from the Hierarchy of Controls:
De-energization of a live circuit before installing a new light fixture
- Personal protective equipment
- Substitution
- Elimination
- Engineering
- Administrative
Step by Step Solution