Question: Material for an earth fill was available from three different borrow sites. In the compacted state the fill measured 1 0 0 , 0 0
Material for an earth fill was available from three different borrow sites. In the compacted state the fill measured at a void ratio of The corresponding insitu void and cost material and transportation of the material for the three sites is as follows:
tableBorrow Site,Void Ratio,Total Cost AED
Make the necessary calculations to select the pit from which the soil should be bought to minimize the cost.