Question: MCE-2412 Class Assignment 01 Estimating Construction Cost To your best of your ability search for the cost estimate of the following items. Material cost Labor

MCE-2412 Class Assignment 01 Estimating
MCE-2412 Class Assignment 01 Estimating
MCE-2412 Class Assignment 01 Estimating Construction Cost To your best of your ability search for the cost estimate of the following items. Material cost Labor cost Equip, cost Total Quant. Unit Description of Work TOTAL COST per Unit per Unit per Unit M+L+E 45.0 C.Y 0.00 315.00 33.00 $348.00 $15,860.00 Demolish remove pavement & curb, remove concrete, mesh reinforced, o 6thickhydraulic hammer, excludes hauling and disposal fees Conduit , rigid galvanized steel 1/2" to 1" diameter, electrical demolition, remove conduit to 15 high, including fittings & hangers Pointing masonry, re-point, mask and grout method, running bond 125.0 LF 150.0 SF Metal floor decking, steel, non-cellular, composite, galvanized, 2D, 100.0 SF 18 gauge Stair, spiral, stoel, stock units, peimed at metal tread, 3-dia 4,0 Flight Gypsum wallboard, on walls, mold resistant, 1/2" thick finish excluded 80.0 SF 100.0 SF 20.0 EN Pants & Coatings, walls, concrete masonry units (CMU), smooth surface, Erstcoat, latex, roller Sprinkler System Components, sprinklerhoadescuchons, standard, brass fone, l' size insulation, duclwork, blanket type, fiberglass, texible, FSK vapor barrier wrap. 75ib. density, 1.1/2" thick Fluorescent fxture, interior, surface mounted, acrylic lens, 4-40 W 2 WX 4' L, inclamps, mounting hardware and connections incandescent facture, residential, exterior lantern, wall mounted, 60 watt 50.0 SF 10.0 Ea 4.0 Ea. Unear FOCUS Suare Foot, yo Yarosh2/CY

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!