Question: ME 4 9 3 Hydraulics: SP 2 0 2 4 Project A pipe network as shown in the image is used to provide water to
ME Hydraulics: SP Project
A pipe network as shown in the image is used to provide water to three houses built on sloped land. To ensure sufficient water flow for simultaneous water consumptions and pressure drop in the mainline, a reservoir is added to the pipe network. Pipe lengths and junction heights are shown in the image. All pipes have a diameter of and roughness of : at the minimum mainline pressure is kPa, determine how much of the water consumption of these three houses comes from reservoir and how much comes from mainline pipeline. Determine the flow head and pressure ignoring the velocity term at each exit flow node.
Assume there is no pressure drop within the mainline pipe and ignore all minor loss elements. As an initial estimate a friction factor of may be considered for all pipes.
Assume
please provide corerect answer and urgently provide it by today
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
