Question: Measurement Section - Figure 1 DQ . 1 . Figure 1 ( D ) shows a section of column base foundation of Type X ,

Measurement Section - Figure 1DQ.1. Figure 1(D) shows a section of column base foundation of Type X, Y and Type Z.In accordance with the Hong Kong SAR Standard Method of Measurement for Civil Engineering Works, 1992 Edition, and using the following information: Measure the items of earthwork, concrete, formwork and steel bar reinforcement for the column base foundations.(Total : 25 Numbers for Type X.6 Numbers for Type Y and 10 Numbers forType Z.) All excavations are in materials other than rock or artificial hard materials. Excavated materials are suitable for filling. Disposal of excavated materials shall be in tips provided by the Employer.Specification:Reinforced concrete mix for base Type X- grade 40/20DReinforced concrete mix for base Type Y and Z - grade 45/20DReinforced concrete mix for column Type X and Z- grade 40/20DReinforced concrete mix for column Type Y- grade 35/20DBlinding concrete for all column bases-grade 20/20SCement - Ordinary Portland Cement to BS 12Steel reinforcement -Mild steel or High yield bars to BS 4449Formwork to all concrete bases - F2Formwork to Type X and Z concrete column - F3Formwork to Type Y concrete column - F4Complete the Measurement, Abstract and Billing for the column base foundation.Blinding
SECTION (Not to Scale)
\table[[Type of Column Base Foundation,Type X (25Nos),Type Y (6 Nos),Type Z (10 Nos)],[Existing Ground Level,19.950,20.000,20.000],[Top Level of Column Base,17.100,17.725,16.550],[Bottom Level of Column Base,16.500,17.075,16.000],[Thickness of Blinding Layer,50mm,75mm,50mm
Measurement Section - Figure 1 DQ . 1 . Figure 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock