Question: MGMT 6091- Mis Field Field Engineering Inc. Preventative maintenance labour requirements at pumping stations Type of Pump Pump Pump Maintenance Station 1 Station 2 Station

MGMT 6091- Mis Field Field Engineering Inc.

MGMT 6091- Mis Field Field Engineering Inc. Preventative maintenance labour requirements at pumping stations Type of Pump Pump Pump Maintenance Station 1 Station 2 Station 3 Overheating 1 2 Circuit Short 3 4 CO2 Emission 2 MIS Pield Engineering has been providing general engineering support services for oftenta Mias traditionally been providing a nechanical Services the focus on managing aware and its services have been valued by the industry. Early this year the company received an offer for a long-term corto over the crude ople transportation from the existing ring is to sea port for gobal market MISI voting whethey should sign which come into effect 2002 With this contact Memes the responsibility mining the lines wing station ved at been asked to submit a bid for a new mega pumping station Carry the www old pumping to PS1PS2, and with effective pumping capacities of 20000 and 4to banc per hout that record to the TOR.02 and OF) with our production 120d To The purong station til denne restore the aude to the sport. The ly operating cost of the the station material and whead 5124 per barrel and the contouring nude from the one to the pundation than in the following O Cost of Pumping Crude Oit (per 10 barrels) PS1 PS2 PS3 from OF1 to 54 $8 58 from OF2 to $16 524 $16 from OF 3 10 58 $10 $24 MIS has the option of contracting the operation of and fing ppines and pumping station The best bidder of the contenders who would me complete operational responsibility of $7.000 hout As a potential tuture contract MISS s been de submit tender for mega pumping station to a conducted at the sea port this station is to the an advanced computerized machinery to replace the oldet til sito submit a bid for total cost of constructing and committing the station as well as the pipelines that connect oil fields to the new mega station. The estimated cost of constructing this meeste k 5315 and pipelines can be constructed at $100.000 per kilometer. The three (OF OP and 3) southeast of the sea port. The first (OF 11 is located 160km south and 200 km east of the port the second (02) Located at 150 dom south and 10 km ent of the port. The oldest field is located 140 km south and 160 km east of the port As the fields allocated in a flat region with no topographic changes straight pipelines with a single lane access road can be constructed easy The CEO of MIS company has signed his Chief Operations Engineer, team Albatrito dalla proposal for each project. A mechanical engineet by training Hesam believed the needed the advice of operational managers for proposal drafts. Last week in a meeting with your group he admitted that during his years with MIShe has been engaged in multiple enceing projects, but us not tien responsible for the operations of facilities. Right now crude s pumped indifferent from the three died at a cost unknown to us. So it would be ideat to have an estimate of the cost and better yet to find how the pumping fick can change to reduce that cost of transferring from the fields need to know if it would be cost efficient webcontract the operations of As a partive maintenance the pumping station can be gliwy monitored for a shorting and showed to CO2 emi.com The maintenance monitoring activities onder optional benefits of repair cost saving of ander minute for PSL. 52 and 53 pedively However, since the maintenance crew have the report they can respectively allocate and our hoursta vet shorting and pollution the following tables the maintenance boments at the pumping tato sting pump stations and frankly, I dont know the hourly cost of operating the pumping stations pe to focus on the mega station project. I can defemine the equipment requirements for the mega station and provide a technical cost estimate to our finance department so they complete the tender for that pojed Given the short time we have to submit the tender am going to need your help with estimating the other cons of the mega project desam rather desperately To help resam, your group needs to lose a technical report in which you address is concern and offer your consultant de plane aho be prepared to orally present and stily your proposal PTYISY Om MGMT 6091- Mis Field Field Engineering Inc. Preventative maintenance labour requirements at pumping stations Type of Pump Pump Pump Maintenance Station 1 Station 2 Station 3 Overheating 1 2 Circuit Short 3 4 CO2 Emission 2 MIS Pield Engineering has been providing general engineering support services for oftenta Mias traditionally been providing a nechanical Services the focus on managing aware and its services have been valued by the industry. Early this year the company received an offer for a long-term corto over the crude ople transportation from the existing ring is to sea port for gobal market MISI voting whethey should sign which come into effect 2002 With this contact Memes the responsibility mining the lines wing station ved at been asked to submit a bid for a new mega pumping station Carry the www old pumping to PS1PS2, and with effective pumping capacities of 20000 and 4to banc per hout that record to the TOR.02 and OF) with our production 120d To The purong station til denne restore the aude to the sport. The ly operating cost of the the station material and whead 5124 per barrel and the contouring nude from the one to the pundation than in the following O Cost of Pumping Crude Oit (per 10 barrels) PS1 PS2 PS3 from OF1 to 54 $8 58 from OF2 to $16 524 $16 from OF 3 10 58 $10 $24 MIS has the option of contracting the operation of and fing ppines and pumping station The best bidder of the contenders who would me complete operational responsibility of $7.000 hout As a potential tuture contract MISS s been de submit tender for mega pumping station to a conducted at the sea port this station is to the an advanced computerized machinery to replace the oldet til sito submit a bid for total cost of constructing and committing the station as well as the pipelines that connect oil fields to the new mega station. The estimated cost of constructing this meeste k 5315 and pipelines can be constructed at $100.000 per kilometer. The three (OF OP and 3) southeast of the sea port. The first (OF 11 is located 160km south and 200 km east of the port the second (02) Located at 150 dom south and 10 km ent of the port. The oldest field is located 140 km south and 160 km east of the port As the fields allocated in a flat region with no topographic changes straight pipelines with a single lane access road can be constructed easy The CEO of MIS company has signed his Chief Operations Engineer, team Albatrito dalla proposal for each project. A mechanical engineet by training Hesam believed the needed the advice of operational managers for proposal drafts. Last week in a meeting with your group he admitted that during his years with MIShe has been engaged in multiple enceing projects, but us not tien responsible for the operations of facilities. Right now crude s pumped indifferent from the three died at a cost unknown to us. So it would be ideat to have an estimate of the cost and better yet to find how the pumping fick can change to reduce that cost of transferring from the fields need to know if it would be cost efficient webcontract the operations of As a partive maintenance the pumping station can be gliwy monitored for a shorting and showed to CO2 emi.com The maintenance monitoring activities onder optional benefits of repair cost saving of ander minute for PSL. 52 and 53 pedively However, since the maintenance crew have the report they can respectively allocate and our hoursta vet shorting and pollution the following tables the maintenance boments at the pumping tato sting pump stations and frankly, I dont know the hourly cost of operating the pumping stations pe to focus on the mega station project. I can defemine the equipment requirements for the mega station and provide a technical cost estimate to our finance department so they complete the tender for that pojed Given the short time we have to submit the tender am going to need your help with estimating the other cons of the mega project desam rather desperately To help resam, your group needs to lose a technical report in which you address is concern and offer your consultant de plane aho be prepared to orally present and stily your proposal PTYISY Om

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!