Question: min Large Item OH Lot size or LT Time Work- Small area Large 195 LS: 90 1 1.5 min Bottling Small 150 LS: 75 1

min Large Item OH Lot size or LT Time Work- Small
min Large Item OH Lot size or LT Time Work- Small
min Large Item OH Lot size or LT Time Work- Small
min Large Item OH Lot size or LT Time Work- Small
min Large Item OH Lot size or LT Time Work- Small
min Large Item OH Lot size or LT Time Work- Small area Large 195 LS: 90 1 1.5 min Bottling Small 150 LS: 75 1 1.5 min Bottling Sanitizer 500 LS: 1200 1 P Cap R-Container Sanitizer H-Container Sanitizer Cap 3400 Min: 5000 1 P P (1) (1) (1.5L) (1) (0.5L) P Purchased part Hoth uzeo be bottled in the same line and both take 1,5 minutes per bottle. There are 0 hours of bottling time per wook The demands for the force bottle is 1180 for wook 6, o for wook 7 and 2000 far week. The demand for the small bottle is 605 for week 6, 530 for week 7, and 100 for wenk 8. The current week is 4 Develop the MRP and CRP plan. Do no plan for R.Container or for H.Container What is the planned release (PE) amount for Large bottles in wook 5? a a 1620 b. 920 C 990 d. 1260 Question 2 What is the planned receipt (PR) amount for Small bottles in week 7? a. 775 b. 525 C. 625 d. 975 What is the Gross Requirement (GR) amount of sanitizer liquid for week 5? a. 1860.0 b. 1472.5 C. 1672.5 d. 1935.0 What is the On Hand (OH) amount of caps for week 6? a. 2035 b. 1980 C. 5910 d. 5 What is the capacity required for week 5 in the bottling line? (in minutes) a. 2385 b. 2835 C. 2047.5 d. 2320.5

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!