Question: MRP task: 100 trailers of a specific model are required by Sask Trailers to meet the demand at the beginning of week 6. A trailer

MRP task: 100 trailers of a specific model are
MRP task: 100 trailers of a specific model are
MRP task: 100 trailers of a specific model are required by Sask Trailers to meet the demand at the beginning of week 6. A trailer requires one bed and one chassis subassembly. A chassis subassembly requires one frame, two axles, and four wheels. 10 chassis subassemblies (complete), 80 frames, 80 axles, and 400 wheels are available in inventory. 40 Axles are scheduled to arrive in week 2. The purchase lead time for frames, axles, wheels, and beds is two weeks. Any chassis quantity between 50 to 100 will require one week to assemble, and 100 trailers will require 2 weeks to assemble. Using the given tables, prepare the material requirements plan for axles. Axles can only be acquired in multiples of 40 units. Directly fill in the provided tables. [10 Marks] ERP Case Study: Read the Case Study: 'Being Bold with ERP: Adoption Dilemma in a Nascent Industry' to answer the following questions: [The link to the case study file is available in the assignment description on Canvas.] [10 Marks ] 1) Which one of the following options do you suggest Bold should adopt for its information management? a) Revert to solely using spreadsheets b) Put more effort and resources into adopting the current ERP system c) Drop the existing ERP system and adopt a mainstream ERP product. 2) What will be the advantages and potential risks if Bold follows your suggestion

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!