Question: Multiple Choice Question 67 For its inspecting cost pool, Ellsworth, Inc. expected overhead cost of $400000 and 4000 inspections. The actual overhead cost for that
Multiple Choice Question 67
For its inspecting cost pool, Ellsworth, Inc. expected overhead cost of $400000 and 4000 inspections. The actual overhead cost for that cost pool was $460000 for 5000 inspections. The activity-based overhead rate used to assign the costs of the inspecting cost pool to products is
(A.)$80 per inspection
(B.)$100 per inspection
(C.)$115 per inspection
(D.)$92 per inspection
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
