Question: n a work center, Machine A has a 2 0 - minute set - up time per batch and a 2 - minute per unit

n a work center, Machine A has a 20-minute set-up time per batch and a 2-minute per unit ru erforms the identical function but has a set-up time of 30 minutes and a 1-minute run time hakes products in batches ranging from 1 unit to 100 units. Assuming capacity is not a limitat rder to minimize the total processing time, on which batches should Machine B be used?
All batches should be run on Machine B since it he shortest run time per unit
Batches of more than 10 units should be run on Machine B.
Batches with up to 20 units should be run on Machine B.
Batches of more than 5 units should run on Machine B.
Batches can be run on either machines since they all have the same break-even points
 n a work center, Machine A has a 20-minute set-up time

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!