Question: Name: ________________________________________ How does Activity Based Costing differ from the traditional overhead allocation system? __________________________________________________________________________________________________________________________________________________________________________ Quality Management: Type of Quality Cost Voluntary or Failure? Type?
Name: ________________________________________
How does Activity Based Costing differ from the traditional overhead allocation system?
__________________________________________________________________________________________________________________________________________________________________________
Quality Management:
| Type of Quality Cost | Voluntary or Failure? | Type? |
| Downtime |
|
|
| Reliability testing |
|
|
| Warranty |
|
|
| Product design |
|
|
| Training costs |
|
|
| Scrap |
|
|
| Customer relations |
|
|
| Inventory inspection |
|
|
| Downtime |
|
|
| Re-inspection |
|
|
| Repair and rework |
|
|
Identify 3 products that would use Job order costing:
(1)_____________________________________________
(2) _____________________________________________
(3)_____________________________________________
Identify 3 products that would use process costing:
1)_____________________________________________
(2) _____________________________________________
(3)_____________________________________________
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
