Question: Need all within 20minsI will rate. QUESTION1 a) Discuss the advantages and disodvantages of using a long thin' versus a 'shart-fat' layout b) A flow

Need all within 20minsI will rate.
Need all within 20minsI will rate. QUESTION1 a)
QUESTION1 a) Discuss the advantages and disodvantages of using a long thin' versus a 'shart-fat' layout b) A flow line or product layout (lleng-thir' errangenent) has seven operater stetions with their timings shown in Table Qt Table Q1 1) Draw the 'flow-line' (product layout). ii) Determine the cycle time of the flow-line. iii) Determine how long it will teke to preduce the first product if the production line starts ep empty. iv) Estimate how many units =ill be produced in a 24 hour period if the line starts up and cleses down enpty. c) Now reconfigure the production line as a 'short-far' arrangement. (Using the manufacturing timings for eoch stage shown in Table QI) i) Draw the new loyout. ii) Determine the cycle time for eoch station. iii) Estimate how many units will be produced in a 24 hour period assuming all stetions are monned

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!