Question: Need all within 20minsI will rate. QUESTION1 a) Discuss the advantages and disodvantages of using a long thin' versus a 'shart-fat' layout b) A flow
Need all within 20minsI will rate.
QUESTION1 a) Discuss the advantages and disodvantages of using a long thin' versus a 'shart-fat' layout b) A flow line or product layout (lleng-thir' errangenent) has seven operater stetions with their timings shown in Table Qt Table Q1 1) Draw the 'flow-line' (product layout). ii) Determine the cycle time of the flow-line. iii) Determine how long it will teke to preduce the first product if the production line starts ep empty. iv) Estimate how many units =ill be produced in a 24 hour period if the line starts up and cleses down enpty. c) Now reconfigure the production line as a 'short-far' arrangement. (Using the manufacturing timings for eoch stage shown in Table QI) i) Draw the new loyout. ii) Determine the cycle time for eoch station. iii) Estimate how many units will be produced in a 24 hour period assuming all stetions are monned
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
