Question: need answer Level 1 Repair & Improvement Underground Pipe System Site Survey Safety Excavation Installation Backfill Level 2 Project Management Inspection Piping System Demolition Damaged
need answer
Level 1 Repair & Improvement Underground Pipe System Site Survey Safety Excavation Installation Backfill Level 2 Project Management Inspection Piping System Demolition Damaged Piping Quality Assurance Safety Plan Trench Shoring Piping Safety Training Pipe Adapters Thrust Block Pipe Insulation Report Level 3 Inspection Assignment for the above WBS create: 1. Activity list 2. Activity Attribute 3. Estimate each Activity duration 4- Sequence Activates