Question: Need clear workings please. Thank you DIGITAL FACTORY EXAMPLE 2... ALB static simulation AND SIMULATION Bosch manufacturing has a customer demand of 250 units per


Need clear workings please. Thank you
DIGITAL FACTORY EXAMPLE 2... ALB static simulation AND SIMULATION Bosch manufacturing has a customer demand of 250 units per day. The process flow is shown in Figure 6.10. The assembly line operates 8 hours per day, with lunch break of 30 minutes and tea break of 30 minutes in between the operations. i. Determine the Takt time for this assembly line. ii. Determine the capacity of the assembly line. iii. Explain whether the assembly line is capable to meet the customer demand. 0.1 min 1.0 min FIGURE 6.10 A simple precedere diagram cycle time (min) 0.1 04 0 1 8.5 02 23 / 30 78.39% i. Determine the Takt time for this assembly line. ii Determine the capacity of the assembly line. iii. Explain whether the assembly line is capable to meet 2.1 man FIGURE 6.10 A simple precedence diagramStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock