Question: Need entire solution with all steps Problem SQ1* Six jobs are to be processed on two machines. The processing time (in days) for each job

Need entire solution with all steps Need entire solution with all steps Problem SQ1*
Problem SQ1* Six jobs are to be processed on two machines. The processing time (in days) for each job on each machine is given below. Find the sequence of jobs that minimizes the total elapsed time to complete the jobs. Also calculate the minimum elapsed time. Draw a Gantt Chart for the required sequence of jobs and indicate idle time on the Gantt Chart. (The jobs are to be processed first on Machine M1)